Bridge Builder

Design a steel truss, then load it and see what happens. Every member's force is worked out with the same method real structural software uses, so a bridge that fails here fails for a real reason. It's the computer version of the spaghetti bridge load test — without the mess.

Level 1 of 5

First span

A 4 m footbridge. One 60 kN load sits at the middle joint — roughly the weight of six tonnes. The left support is a pin. The right one is a roller, which holds the bridge up but can slide sideways.

Build with

60 kN

Click one joint, then another, to connect them with a member.

Steel used
0.0 kg
Reference design
57.2 kg
Efficient at or under
72 kg
Your lightest pass
—

The reference is a good design, not a proven-lightest one. If you pass with less steel, you've beaten it.

What each type can take

TypePulledSqueezed · 2.0 mSqueezed · 2.8 mSqueezed · 4.5 m
Solid rod79 kN3.9 kN1.9 kN0.8 kN
Tube239 kN239 kN171 kN68 kN
Heavy tube829 kN829 kN829 kN716 kN

Pull limits don't depend on length. Squeeze limits do, because long members buckle. Steel: yield strength 250 MPa, stiffness 200,000 MPa, density 7,850 kg/m³.

Your designs and best results are saved in this browser only. Nothing is sent anywhere.

How the test works

When you press Test, the page solves your structure with the direct stiffness method, the approach real structural analysis software is built on. Each member is treated as a very stiff spring that can only push or pull along its own length. The solver finds where every joint has to move to so that the forces on it balance, then reads each member's force from how much it stretched or shortened.

Each member is then checked. Pulled or squeezed, steel yields when the force divided by its cross-section area reaches the yield strength. Squeezed members get a second check, Euler's buckling formula:

buckling load = π² × E × I ÷ L²

E is the steel's stiffness, I measures how far the cross-section's material sits from its centre, and L is the member's length. Strength isn't in the formula at all. A long thin member bows sideways long before the steel itself is in trouble, and doubling its length cuts its limit to a quarter. That's why the tubes do so much better than the rod when squeezed, and no better per kilogram when pulled.

If some joints can move without stretching any member, there is nothing to solve. Engineers call that a mechanism, and the game rings the joints that are loose instead of pretending to have an answer.

What this game leaves out

It's a real calculation, but a simplified bridge. Things a structural engineer would not be allowed to ignore: