Bridge Builder
Design a steel truss, then load it and see what happens. Every member's force is worked out with the same method real structural software uses, so a bridge that fails here fails for a real reason. It's the computer version of the spaghetti bridge load test — without the mess.
Level 1 of 5
First span
A 4 m footbridge. One 60 kN load sits at the middle joint — roughly the weight of six tonnes. The left support is a pin. The right one is a roller, which holds the bridge up but can slide sideways.
Build with
Click one joint, then another, to connect them with a member.
- Steel used
- 0.0 kg
- Reference design
- 57.2 kg
- Efficient at or under
- 72 kg
- Your lightest pass
- —
The reference is a good design, not a proven-lightest one. If you pass with less steel, you've beaten it.
What each type can take
| Type | Pulled | Squeezed · 2.0 m | Squeezed · 2.8 m | Squeezed · 4.5 m |
|---|---|---|---|---|
| Solid rod | 79 kN | 3.9 kN | 1.9 kN | 0.8 kN |
| Tube | 239 kN | 239 kN | 171 kN | 68 kN |
| Heavy tube | 829 kN | 829 kN | 829 kN | 716 kN |
Pull limits don't depend on length. Squeeze limits do, because long members buckle. Steel: yield strength 250 MPa, stiffness 200,000 MPa, density 7,850 kg/m³.
Your designs and best results are saved in this browser only. Nothing is sent anywhere.
How the test works
When you press Test, the page solves your structure with the direct stiffness method, the approach real structural analysis software is built on. Each member is treated as a very stiff spring that can only push or pull along its own length. The solver finds where every joint has to move to so that the forces on it balance, then reads each member's force from how much it stretched or shortened.
Each member is then checked. Pulled or squeezed, steel yields when the force divided by its cross-section area reaches the yield strength. Squeezed members get a second check, Euler's buckling formula:
buckling load = π² × E × I ÷ L²
E is the steel's stiffness, I measures how far the cross-section's material sits from its centre, and L is the member's length. Strength isn't in the formula at all. A long thin member bows sideways long before the steel itself is in trouble, and doubling its length cuts its limit to a quarter. That's why the tubes do so much better than the rod when squeezed, and no better per kilogram when pulled.
If some joints can move without stretching any member, there is nothing to solve. Engineers call that a mechanism, and the game rings the joints that are loose instead of pretending to have an answer.
What this game leaves out
It's a real calculation, but a simplified bridge. Things a structural engineer would not be allowed to ignore:
- There is no safety margin. Here a member at 99% of its limit passes. Real design codes require a healthy margin, and they treat buckling more cautiously than Euler's formula does, because real members are never perfectly straight.
- The bridge's own weight is ignored. On a real bridge the structure has to carry itself as well as the traffic, and on long spans that can be the bigger job.
- Every joint is a perfect pin. Real connections are bolted or welded, and each one has to be designed too.
- The loads sit still. Real traffic moves and repeats millions of times, and wind and temperature push on the structure as well. Repeated loading can crack steel at forces well below what would break it once — that's called fatigue.
- Sag isn't checked. Real bridges have limits on how far they may deflect, not only on whether they break.
- Lightest isn't the same as cheapest. The game scores steel by weight. A real project also pays for fabrication, transport, labour and maintenance, and a slightly heavier design that is simpler to build can be the better one.
- Only the first failure is shown. Some real structures can pass load to other members after one fails and others can't. The game stops at the first member to give way.